EV Charger Installation Cost Calculator UK 2026

Estimate the total cost of installing a home EV charge point, unit, labour, consumer unit upgrade and OZEV EV chargepoint grant (for eligible flats and rentals).

Updated April 2026 OZEV EV Chargepoint Grant included 7kW & 22kW options
Woman charging an electric car from a home wallbox
A 7 kW home charger refills a typical EV overnight, and off-peak tariffs cut the cost to roughly a quarter of public charging.

1 Charger spec

2 Installation

Based on cable run from your consumer unit (fuse box) to the charger location, and routing.
Pre-2015 consumer units often need an upgrade to comply with the 18th Edition regs for EV charging.

3 Grant eligibility

The OZEV EV Chargepoint Grant (£350) is now only available to flat owners, long-term rental tenants, and landlords. Owner-occupiers of houses are no longer eligible (scheme changed April 2022).

Your estimated EV charger installation cost

£0
Pre-grant total
£0
Net cost (after grant)
Charger unit£0
Installation labour£0
Consumer unit upgrade£0
OZEV grant—
Typical installation time3–4 hours

OZEV EV Chargepoint Grant — check eligibility

The OZEV grant of £350 is available to flat owners, rental tenants (with landlord permission), and landlords. Owner-occupiers of houses are no longer eligible as of April 2022.

View all open UK energy grants →

Typical home EV charger installation costs (UK 2026)

Charger specUnit costInstall (simple)Install (complex)Charge time (40 kWh battery)
3kW tethered£300–£500£600–£800£900–£1,200~13 hours
7kW tethered£600–£900£900–£1,200£1,400–£1,900~6 hours
7kW untethered£550–£850£900–£1,200£1,400–£1,900~6 hours
22kW 3-phase£900–£1,400£1,400–£2,000£2,500–£3,500+~2 hours

Source: UK installer market rates, Q1 2026. 22kW requires a 3-phase supply, which most UK homes don't have — installing 3-phase costs £3,000–£8,000+ separately.

Assumptions and limitations

  • Unit costs based on mid-range smart chargers (Ohme, Wallbox, Andersen, Project EV, Myenergi Zappi) Q1 2026 UK pricing.
  • Base installation includes up to 5m of cable run, single-phase supply, standard surface mounting, RCD protection and certification.
  • Consumer unit upgrade (£400) only added if your fuse box is pre-2015 or you're unsure — your installer will confirm.
  • OZEV EV Chargepoint Grant: £350, available to flat owners (with dedicated parking), rental tenants (with landlord permission), and landlords. Owner-occupiers of houses have not been eligible since April 2022.
  • Installers must be OZEV-authorised for the grant to apply. Grant is claimed by the installer on your behalf and deducted from the quote.
  • 22kW chargers require a 3-phase electrical supply — most UK homes are single-phase. Upgrading to 3-phase is a separate cost (typically £3,000–£8,000+) paid to your DNO.
Sources and review OZEV EV Chargepoint Grant scheme — gov.uk
UK charger installer pricing Q1 2026 (Octopus Electroverse, Pod Point, British Gas)
BS 7671 18th Edition — IET wiring regs for EV charging installations
Reviewed by BetterHomeEnergy Research Team, April 2026. Editorial policy →